Facilities
Production
- Daily volume: c.80,000 welded assemblies for 5 carlines
- Production Space 33,000 m2
- 280 Industrial Robots
- Purely Pull Production - based on flexible production cells using "turn-table concept"
- Cycle Time 30-60 Seconds
Logistics
- Close supplier-customer relationship:
- 450 different parts received from Ford (pressings, nuts, bolts, etc.)
- 130 different assemblies shipped to Ford
- all incoming material on consignment
- Stock to customer time: 0.5hr-2hr
- Delivery in trailers (batch production) and Conveyor (Just-in-Sequence)
- Electronic Kanban system (smart call) Stadco <-> Ford
Quality
- 3 CMM machines for dimensional inspection (3 x 8m)
- Certificates
- TS 16949 (2002), QS 9000, ISO 14001
- Customer award: Ford Q1